Skip to content
Van Cleef Engineering
  • About Us
  • WBE Certified
  • Our Services
  • Insights
  • Life at Van Cleef
  • Careers
  • Contact Us
  • Payment Portal
  • Our Locations

Discipline: Water/Wastewater

Vertical mixer on a platform over a brown wastewater basin at a treatment facility, with yellow railing and workers in the background.
Jill Esposito

WWTP Headworks Mechanical Fine Screen Replacement​

[…]

Read More…

Read More
07/08/2026
Black corrugated drainage culvert extending from a rocky path toward a lake with a tree-lined shore and cloudy sky in the background.
Jill Esposito

WWTP Effluent Outfall Emergency Replacement​

Van Cleef provided emergency investigation, design, permitting, construction administration, and field coordination for replacement of the Portland Borough Wastewater Treatment Plant’s obstructed effluent outfall. The […]

Read More…

Read More
07/08/2026
Large black cylindrical water storage tank with exterior metal ladder and piping, outdoors on a concrete pad under a blue sky.
Jill Esposito

Richland Court Water Storage Tank Replacement

Van Cleef provided grant funding, design, PADEP permitting, COSTARS procurement, construction administration, and grant reimbursement management for replacement of the Richland Township Water Authority’s aging […]

Read More…

Read More
07/08/2026
Large dark blue cylindrical storage tank with metal ladder and railing, outdoors among trees on a gravel site.
Jill Esposito

East Bangor Water Storage Tank Addition​

Van Cleef provided grant funding, design, PADEP permitting, COSTARS procurement, construction administration, and grant reimbursement management for a new 54,000-gallon aboveground water storage tank at […]

Read More…

Read More
07/08/2026
Rectangular concrete water-treatment basin with dividing walls and surrounding metal railings, a bright yellow grate in the foreground.
Jill Esposito

Chlorine Contact Tank Replacement

Van Cleef provided design, permitting, bidding, and construction-phase services for the replacement of the Bowmanstown Borough Wastewater Treatment Plant’s aging chlorine contact tank. The original […]

Read More…

Read More
07/08/2026
Jill Esposito

Oakhurst Wastewater Treatment Plant Facility Assessment

[…]

Read More…

Read More
04/15/2026
Jill Esposito

Metering Station Improvements

[…]

Read More…

Read More
03/27/2026
Jill Esposito

Lake Drive Water Main Extension

[…]

Read More…

Read More
03/27/2026


Locations
E-Newsletter Sign-Up
  • Make a Payment
  • Job Postings
  • Contact Us

© Van Cleef Engineering. All Rights Reserved.